|
The Exploration and Production Lifecycle
There are five stages in the exploration and
production
‘lifecycle’. These
stages step through
how hydrocarbons are
discovered to what
happens after an oil
or gas field is
decommissioned. Each
stage is described
below in terms of
the activities,
jobs, cost and time
involved. There are
also risks at every
stage, which need to
be managed
responsibly by oil
and gas companies.
| 1.
Exploration
Oil and gas exploration is the search by petroleum
geologists and
geophysicists for
hydrocarbon deposits
(oil and gas)
beneath the Earth's
surface. It involves
locating oil and gas
reservoirs using
primarily seismic
surveys
Exploration is an
expensive, high-risk
operation because
the cost runs into
many tens of
millions of dollars
and every two out of
three wells, on
average, contain no
hydrocarbons. It may
therefore require
companies to drill
multiple wells in
one area before
finding an oil or
gas discovery, which
can take several
years. However,
explorers can also
find that some
sedimentary basins
do not contain any
hydrocarbons at all.
During exploration
drilling,
information and
samples are
collected about the
rocks and fluids
(water, gas and oil)
encountered by the
well in order to
find out:
·
Whether there are
any hydrocarbons at
that location
·
How much oil or gas
might be present
·
What depth the oil
or gas occurs at
Exploration
activities can also
be risky because of:
·
The location -
remote or difficult
terrain, or a
sensitive ecosystem
·
Safety - people can
have accidents while
acquiring seismic
surveys or drilling
wells, even though
safety is always a
top priority
|
|
2.
Appraisal
If a company is successful with their exploration
drilling and make an
oil or gas
discovery, then they
move into the
appraisal phase of
the lifecycle. The
purpose of this
phase is to reduce
the uncertainty
about the size of
the oil or gas field
and its properties.
During appraisal, more wells are drilled to
collect information
and samples from the
reservoir. Another
seismic survey might
also be acquired in
order to better
image the
reservoir. These
activities can take
several more years
and cost tens to
hundreds of millions
of dollars.
More seismic surveys and wells help petroleum
geologists,
geophysicists and
reservoir engineers
understand the
reservoir better.
For example, they
try to find out
whether rock or
fluid properties
change away from the
discovery well, how
much oil or gas
might be in the
reservoir, and how
fast oil or gas will
move through the
reservoir.
The appraisal stage is successful if a company
decides that the oil
or gas field can be
developed. One risk
that companies face
is even after
investing time and
money in the
appraisal stage,
they might not find
a way to develop the
field safely,
profitably and
responsibly (in
terms of communities
and the
environment).
3.
Development
The development stage takes place after successful
appraisal and before
full-scale
production.
·
To form a plan to
develop the oil or
gas field, including
how many wells need
to be drilled to
produce the oil or
gas (geologists,
geophysicists and
reservoir engineers)
·
To decide the best
design for the
production wells
(drilling engineers)
·
To decide what
production
facilities are
required to process
the oil/gas before
it is sent to a
refinery or customer
(facilities
engineers)
·
To decide what the
best export route
might be for the oil
and gas (logistics
engineers)
Executing the development plan involves drilling
engineers who drill
the first phase of
production wells and
project engineers
who build the
planned facilities.
Many thousands of
people can be
involved in building
production
facilities, and
safety is a top
priority. The risk
of accidents is
highest in this
phase because of the
number of people
involved at
construction sites.
It costs hundreds of millions, sometimes even
billions of dollars
and typically 5-10
years to develop an
oil or gas field,
depending on the
location, size and
complexity of the
facilities, and the
number of wells
needed. Onshore
developments are
typically much
cheaper than
offshore
developments.
No oil or gas field will be developed unless the
company believes
that they will make
enough money to pay
back their
exploration,
appraisal and
development costs,
as well as profit
from selling the
hydrocarbons. Even
more importantly,
developments will
only happen if the
communities or
ecosystems affected
can be protected
4.
Production
Production is the phase during which hydrocarbons
are extracted from
an oil or gas field
and the first money
(or revenue) comes
from selling the oil
or gas. After a
number of years, the
revenue exceeds the
company’s investment
and they begin to
make a profit.
Production can last several years up to 40 years,
depending on the
size of the oil or
gas field and how
expensive it is to
keep the wells and
production
facilities running.
Every year millions
of dollars will be
spent on operating
and maintaining the
field. Safe
production
operations is
critical, otherwise
companies risk
harming people or
the damaging the
environment, eg.
through an oil
spill, or explosion.
Operators work in shifts to keep production
going. Engineers
will usually be
located full-time at
the production
facilities in order
to operate and
maintain them.
Reservoir engineers
will check on the
health and
performance of the
field to plan how
best to maintain
production.
Additional wells
might need to be
drilled or the
production
facilities improved
to maximise recovery
of the oil or gas.
5.
Decommissioning
Decommissioning is the term used for removing the
production
facilities and
restoring oil and
gas sites that are
no longer
profitable. The term
is usually used to
refer to offshore
facilities. Offshore
oil and gas
platforms can be
vast structures
requiring large
amounts of materials
in their
construction. By
bringing the
facilities onshore
for dismantling and
disposal, these
materials can be
reclaimed.
Decommissioning not only involves removing the
main platform, but
pipelines and cables
as well. The aim is
to reduce the risk
to the marine
environment and to
reuse or recycle
materials. In the
majority of cases,
all equipment is
removed and the site
returned to its
condition before
development began.
Some installations
can be reused as oil
and gas facilities
at another location
or reused in place
for another purpose
(e.g., as a wind
farm or aid to
navigation).
Occasionally, part
of the platform may
be left in place
because they benefit
the marine
environment, e.g.,
steel legs of
tension leg
platforms that are
used to create
artificial reefs in
the Gulf of Mexico.
Project, logistics and environmental engineers
will be involved in
decommissioning a
production facility.
This vital step
takes several years
and many millions of
dollars. Government
requirements and
community views will
be taken on board
during
decommissioning. |